CSLB #1138550  ·  Licensed, Bonded & Insured  ·  30+ Years of Hands-On Experience
Home  /  Sample Estimates

Sample Estimates

Read Our Proposals Before You Ever Call Us.

A roofing proposal tells you everything about a roofer: what’s included, what’s excluded, how surprises are priced, and whether the number on the last page is the number you’ll actually pay. Here are real Mars Roofers estimates so you can judge ours before we’re standing on your roof.

Call 310.880.9718

Sample Estimates — Read Them Now

Two complete Mars Roofers proposals in our standard format — summary up front, findings, phased scope, grouped line items, deck terms in the open, and schedule, payment, and warranty terms before the signature line. The properties are samples; the format and pricing structure are exactly what our customers get.

Sample Estimate — Concrete Tile Re-Roof (Orange, CA)

Full tear-off of an existing concrete tile roof, new two-layer synthetic underlayment system, and new concrete tile on a two-story home — approx. 2,400 sq ft of roof (24 squares).

Contract total: $30,350

View Sample Estimate (PDF)

Sample Estimate — Architectural Shingle Re-Roof (Long Beach, CA)

Full tear-off and architectural laminate shingle re-roof on a single-story home, with new underlayment, metals, and a continuous ridge vent — approx. 1,800 sq ft of roof (18 squares).

Contract total: $13,480

View Sample Estimate (PDF)

Sample Roof Measurement Reports

Every Mars estimate starts with a measured roof — areas, pitches, ridges, valleys, and waste factors, documented like this.

Roof Measurement — Lakewood, CA

2,095 sq ft · 5/12 pitch · 6 facets

View Measurement Report (PDF)

Roof Measurement — Laguna Hills, CA

4,788 sq ft · 5/12–6/12 pitch · 16 facets

View Measurement Report (PDF)

What To Look For In Any Roofing Estimate — Ours Included

Scope in plain language

What is being removed, what is being installed, and what is being left alone — named specifically, not “roof work as needed.”

Materials named

Underlayment type, finish material, flashing scope. If a proposal doesn’t name the materials, the materials will be chosen for you later — by price.

Deck terms in writing

How damaged decking is priced if it’s found during tear-off. This is the line where honest roofers and the other kind part ways.

Combined pricing

Our estimates use combined labor-and-material pricing — one real number per scope item. (Our internal costs stay internal; your total is never a mystery.)

Exclusions stated, not buried

What’s NOT included is listed openly, so the total you compare is the total you’ll pay.

License credentials attached

Every Mars formal estimate carries our license, certification, and insurance pages — CSLB #1138550, NRCIA, SB-PW / SB(Micro).

How Our Estimates Are Numbered

Mars proposals follow our standard format — numbered, dated, and tied to the property address — with a summary up front, findings and photos, the phased scope, grouped line items, allowances and exclusions in the open, and schedule, payment, and warranty terms before the signature line. When you get one, this page is your decoder ring.

Want yours? Call 310.880.9718 or email brett@marsx.construction.

Get Started

Start With a Conversation.

Every project starts the same way — you describe what you need, and we give you an honest read on the best way to get there.

Our Family of Companies